Hawksgrove Cottage
Design of plant room and trenching requirements and Installation of NIBE 1345 30kw, NIBE 500L buffer Vessel and NIBE 1000L DHW Cylinder. To reduce time on site the plantroom was prefabricated in our warehouse
Location
Planning a similar project?
Seen what's possible with a low-carbon heating solution? If you're considering a similar upgrade, tell us a little about your property and what you'd like to achieve. A member of the Solaris Energy team will be in touch to talk through your options.